Home - Product - Waterproof Coating - 911 Two-component Polyurethane Waterproof Coating
911 Two-component Polyurethane Waterproof Coating

911 Polyurethane Waterproof Coating

This product is a two-component reaction-curing polymer waterproof coating. It is composed of a polyurethane prepolymer (component A) containing isocyanate groups (-NCO) and a cured body containing polyhydroxyl (-OH) with a plasticizer. Tackifier, antifungal agent, diluent and other auxiliary agents mixture (component B). The two components are mixed in a certain proportion, and after mixing, they are evenly painted to form a flexible, tough and durable waterproof coating film on the base surface.

Description

Product advantages

1. Liquid construction, short solidification period, a combination of bonding and waterproofing functions, suitable for large-area seamless construction of interfaces of various shapes;

2. It has excellent extensibility and tensile strength, and has a bridging effect on the expansion and deformation and cracking of the waterproof base layer;


The scope of application

1. It can be used for roofs of concrete, wood, steel, asbestos tiles and other structures;

2. Basement concrete floor, inner and outer walls, tunnels;

3. Anti-rust and anti-corrosion for toilets, kitchens, downspouts and sewage tanks;


Construction technology

1) The substrate must be firm, flat, clean, free of dust, greasy, wax, release agent, etc. and other debris;

2) All small pores and sand holes can be mixed into a wet mass with the plugging king and a little water, and then smoothed;

3) The construction base surface is required to be dry, solid, smooth, free of dust, no oil, and moisture content <8℅;

4) The coating construction is usually carried out in two passes. Apply the mixed paint evenly on the base surface with a rubber spatula or a brush, and apply it repeatedly in two vertical directions to ensure the penetration and adhesion of the paint on the base surface. In the first layer After the coating is cured (4-8 hours), the second construction can be carried out;

5) It is forbidden to step on within 24 hours after the completion of the construction, and the protective layer should be made immediately after all the waterproof layers are completely dry;


Matters needing attention

1. The mixed paint should be used up within 20 minutes, and the construction temperature should be above 5℃;

2. Keep air circulation during construction;

3. The lid of the unused paint must be sealed to prevent the paint from absorbing   moisture and curing, and prevent the sun, rain, and collision during transportation;


none
Related Tags : Waterproof Coating

Reach Us and Our Team Are Ready to Help

Guangdong Huolun Building Materials Technology Development Co., Ltd. is a manufacturer engaged in the R&D, production, and sales of waterproof materials and related auxiliary materials for construction. Our main products cover waterproof coating, heat insulation coating, metal anti-rust paint, and so on.

Leave A Message

Guangdong Huolun Building Materials Technology Development Co., Ltd.

Speciliazed in R&D, production, and sales of waterproof materials

Get in Touch

We love question and feedbacks-and we’re always happy to help! Send us a message and we’ll respond as soon as possible.

Copyright © 2015 Guangdong Huolun Building Materials Technology Development Co., Ltd. All Rights Reserved.            Privacy Policy Powered by Bontop